Rembrandt House

Residential Flats - London

Case Study Description

rembrant house interior
TYPE
HMO, Flats, ‘Change of Building Use’
COMPLETION TIME
12 Months
AREA
London, England
PUMP QUANTITY
1 Residential
NOZZLES QUANTITY
320+

Background

Rembrandt House was a disused Edwardian hospital. This was a ‘change of building use’ project, with the property being converted to a total of 80 flats. The overall project took one year to complete, with iMist frequently designing in line with the developers’ programme of works (POW).

Solution

The system was connected to many third-party installations such as AOVs and fire panels which allowed iMist to showcase our system and work with the London Fire Brigade, who were impressed with the capability of our products.